![]() |
|
Village of Princeville Thursday, May 25, 2006 7:30PM The Princeville Village Board met at the above date and place. Motion by Rasmussen with a second by Troutman to accept the bid of R.A. Cullinan at a cost of $228,649.23 was made. Roll call vote; Sutherland, Rasmussen, Barrington and President Stahl all voting aye. No nayes. Motion passed. Rickey and Troutman abstaining. Koller was absent. Motion by Barrington seconded by Rasmussen to approve the fees of BCZ engineers for a cost of $31,200.00 for engineering and follow thru on the project. Roll call vote; Sutherland, Rasmussen, Barrington and President Stahl all voting aye. No nays. Motion passed. Rickey and Troutman abstaining. Koller was absent. Copies of all bid documents are on file at the Princeville Village Hall. Motion by Rasmussen and second by Rickey to adjourn the special board meeting was received. Voice vote. All ayes. No nays. Motion passed. Milton Rasmussen |
|
Web
Site Created & Maintained by: Storm Front Productions www.stormfrontprod.com Copyright 2006 - Village of Princeville, IL |
|